About how this is done, it was said earlier (see "Fixing drywall sheets to the walls"). Consider a pair of two skeletons partitions. When installing the corner, consider the distance between the guide profiles that at an angle to each other, this distance should be equal to the thickness of the lining of the drywall on one side of the frame. Last Stand, which is adjacent to a nearby wall, fitted with a sheet of drywall. Screw-tapping should flash the rack profile, sheet and plasterboard walls of another rack profile. Sometimes, the height exceeds the length of a shell rock sheets (2500 mm), so in the field of end joints of sheets needed mounted horizontal sections of the guide profile.
For structural strength end joints must be offset relative to each other vertically by not less than 400 mm. Fixing of the need to maintain the angle of the leaf two mutually perpendicular directions. In addition, the installation of sheets should be made in the same direction with the open part of the profile that will ensure the installation of screws in the first place closer to the wall, and when mounting the neighboring Screw the sheet screw will not turn down a shelf inside the profile. Seam of two adjacent gypsum board sheets should not be placed on racks, which is attached to door frame. Place their joints should always be on intermediate rack that is installed above a horizontal crosspiece of the profile. Therefore, it would be correct to cut a whole sheet of a form corresponding to the doorway. In the next step is laying in space between the rack profiles of insulating material.
Insulation should be tightly fill the gap between the profiles and should not slip. It remains to establish and secure the plasterboard on the other side of the framework. It is important as follows: the vertical joints between gypsum sheets shift one step rack profiles (600 mm) in relation to the first side plating. Thus, the installation begins with pergorodki incomplete sheet of drywall. At two-layer plating all longitudinal and transverse joints of the second layer of plasterboard should be done with a shift relative to the first layer of sheet joints in step racks (600 mm). In addition, when a two-layer plating end joints of first sheet layer should be offset from joints of sheets of the second layer is not less than 400 two-layer plating mm.V by attaching sheets of the first layer is allowed to increase the pitch of screws in 3 times (750 mm).